■Job description
- Survey, draw up principle drawings, equipment and pipeline layout drawings
- Quantity take-off, preparation of technical documents, bidding documents, and quotations
- Plan to prepare materials, equipment, human resources needed to prepare, and construction methods for the project
- Manage and control labor, subcontractors, assets, and costs during the construction process
- Perform product quality checks according to standards
- Prepare documents for completion and acceptance
- Jobs will be discussed specifically during the interview
■REQUIREMENTS
- Male, 28~33 years old
- Graduated University
- To have working experience for the project of Chemical plant construction at EPC company in the position as Detailed design engineer as piping field for more than 5 years.
- Has experience of such kind job in the Chemical filed at EPC company
English intermediate, ~TOEIC ~ score
■Salary(VND)
~$ Gross
■Working time: Monday ~ Friday : : :
■Benefit:
- Probation: 100% salary
- Insurance according to law
- Annual leave and public holidays during the year.
- 13th month salary, annual salary review