• In charge of managing and directing the work of the production engineering group.
• Take main responsibility for construction methods, estimate technical norms, analyze cost estimates, and provide quotations for quotation or bidding projects.
• Responsible for the efficiency, quality, progress and accuracy of all work in the engineering department.
• Assign work, plan the work schedule of projects as required from the sales department for the members of the department.
• Control records, drawings, norms, estimates before submitting to the Manager and transferring to the production department.
• The focal point with the design and engineering department since being assigned by the foreman to unify information on project implementation.
• Coordinating with the design and supervision department to handle existing and arising technical problems during the project implementation.
• Technical supervision of interior products during production, construction and installation.
• Deploy technical drawings, make detailed specifications, construction plans
• Disassembling, checking volume based on design drawings, interior construction orders.