- Monitor and manage construction contracts (Terraco painting and waterproofing items) - grasp detailed information about contract value, implementation time, and items that need to be completed.
- Based on the winning estimate, separate costs for accounting.
- Read the project estimate carefully, stick closely to the cost breakdown table - accurately grasp the cost level so that when exporting materials, it must be consistent with the estimate norm.
- Monitor material costs, labor costs, equipment operations... promptly detect differences compared to norms - identify causes, other costs beyond the estimated plan...
- Monitor construction logs to accurately determine specific fuel consumption levels of construction machines.
- Collect, allocate costs and calculate the cost of each project and item (according to construction location).
- Check the process of implementing the cost plan - propose effective and reasonable solutions to reduce costs.
- Monitor unfinished costs and calculate costs for each project - item to serve the settlement of the total value of the work.