- Coordinating with departments, chairing, project leader.
- Project meeting with project leader, project manager (CEO if required).
- Prepare preliminary design plan (TKSB).
- Design the TKSB plan (make a spreadsheet for each MEP system).
- Handling and coordinating with departments in TKSB.
- Notes to TKSB.
- Show TKCS (Basic Design).
- Explanation of TKCS.
- Check TKCS.
- Show technical and financial accounting.
- Calculating data.
- Notes on technical and financial accounts, SPEC.
- Volume estimates.
- Check technical accounts & technical accounts.
- Author supervision, meeting at construction site.
- Handling design adjustments during project construction.
- Perform other tasks as assigned by superiors: Other tasks/reports as assigned by direct management, Board of Directors.