- Planning the construction organization, planning the supply of materials, the plan to mobilize human resources and
construction equipment.
- Setting up and managing the construction progress, managing the construction teams of the items on the construction site; newspaper
Report periodically on the work required by the superior on a weekly basis.
- Management of construction quality, technical requirements for construction on site, organization of acceptance test
with relevant entities.
- Management of the construction volume of the construction site; Summarize the construction volume by each stage of construction
labour; Proposing construction materials.
- Management of construction techniques and labor safety measures.
- Management of environmental sanitation, measures to preserve construction equipment, construction materials.
- Preparation of as-built drawings, pre-acceptance documents, quality management documents; total volume
to serve as a basis for acceptance and payment of works.